# Can H-Power's HY5 Ammonia Cracker Really Make Hydrogen for GBP10 per kg?

![David Coleman](/uploads_resolved/images/261/320.webp)

[David Coleman](/authors/david-coleman/ "Author profile for David Coleman")Founder & Renewable Energy Author, kilowatts.uk

# Can H-Power's HY5 Ammonia Cracker Really Make Hydrogen for GBP10 per kg?

**Published:** 2026-11-24 13:48:57

**Updated:** 2026-11-24 05:50:03

See what H-Power’s HY5 ammonia cracker offer covers and how minimum volumes and compression affect the £10/kg hydrogen price for UK industrial sites.

 [   Preferred on Google  ](https://www.google.com/preferences/source)

 ![Create a clean editorial diagram for a UK energy resource showing how an industrial ammonia cracker supplies hydrogen near the point of use. Show four labelled stages from left…](/uploads_resolved/images/1398/320.webp)## H-Power HY5 ammonia cracker: What does the £10/kg hydrogen offer cover?

H-Power advertised on-site hydrogen at £10 per kg, subject to a minimum contract term and take-or-pay provisions. The company, then called AFC Energy, published the price in its 6 November 2025 trading update. Independent evidence of the production cost is still lacking, and the 29 October 2026 announcement about the proposed HY5 deployment with Protium gives no contract price. What a buyer pays per usable kilogram depends on how much hydrogen it takes, what the supplier includes and the pressure required at handover. [November 2025 trading update](https://assets.lsegissuerservices.com/original-f99cba35-9813-46bf-8fed-065007478d12.pdf "Lsegissuerservices – November 2025 trading update") · [October 2026 regulatory announcement](https://www.investegate.eu/announcement/rns/h-power-plc--hpow/hot-agreed-to-supply-hy5-ammonia-cracker-/9846874 "Investegate – October 2026 regulatory announcement")

## What did H-Power and Protium agree?

On 29 October 2026, H-Power announced heads of terms with Protium Green Solutions for a HY5 ammonia cracker at a customer site. The proposed initial term is two years. H-Power expects deployment to begin in the second half of 2027, subject to a definitive agreement and the necessary planning and permitting approvals. The announcement leaves the site unnamed. [October 2026 regulatory announcement](https://www.investegate.eu/announcement/rns/h-power-plc--hpow/hot-agreed-to-supply-hy5-ammonia-cracker-/9846874 "Investegate – October 2026 regulatory announcement")

H-Power would supply, install and commission the unit, train Protium staff and provide ongoing engineering support. Protium would operate it. Under a separate June 2026 agreement, Protium agreed to buy 5,000 kg of hydrogen from H-Power’s Dunsfold pilot plant, where it collects the gas for distribution. [October 2026 regulatory announcement](https://www.investegate.eu/announcement/rns/h-power-plc--hpow/hot-agreed-to-supply-hy5-ammonia-cracker-/9846874 "Investegate – October 2026 regulatory announcement") · [H-Power’s June 2026 supply announcement](https://www.h-power.co.uk/news-and-events/news/supply-agreement-with-protium-for-5-000kg-of-green-hydrogen-from-cracked-ammonia/ "Co – H-Power’s June 2026 supply announcement")

## How does the HY5 work and how much can it produce?

An ammonia cracker uses heat and a catalyst to split ammonia into hydrogen and nitrogen. The hydrogen is then purified. For a fuel-cell installation, ask the supplier to specify limits for residual ammonia and other impurities. Check those limits against the receiving equipment’s requirements and agree how to verify gas quality, pressure and flow at handover.

H-Power’s 29 October 2026 announcement puts the HY5’s design maximum at 500 kg of fuel-cell-grade hydrogen per day. Independently measured customer-site figures for sustained output, availability and energy use per kilogram are still unverified. Before committing, ask for metered output at the agreed purity and pressure over a period that covers start-ups, low demand and planned maintenance. If the site uses the hydrogen to generate electricity, factor in the generator’s own power rating and efficiency. [October 2026 regulatory announcement](https://www.investegate.eu/announcement/rns/h-power-plc--hpow/hot-agreed-to-supply-hy5-ammonia-cracker-/9846874 "Investegate – October 2026 regulatory announcement") · [H-Power interim results](https://www.h-power.co.uk/media/20hpp1pg/100626-hpow-1h-2026-interim-results.pdf "Co – H-Power interim results")

If the project’s main goal is on-site electricity generation, use the site’s demand profile to [compare industrial solar installations](https://kilowatts.uk/services/industrial/renewable-energy/industrial-solar-panel-installation/compare/ "Compare industrial solar options") alongside the fuel-cell proposal.

## What would make £10 per kg achievable for a buyer?

Compare the contract minimum with your expected demand, allowing for shutdowns and seasonal changes. A take-or-pay clause can require you to pay for a minimum quantity even if you take less. Ask how the agreement handles supplier outages and whether you can carry forward unused volumes. [November 2025 trading update](https://assets.lsegissuerservices.com/original-f99cba35-9813-46bf-8fed-065007478d12.pdf "Lsegissuerservices – November 2025 trading update") For example, an annual minimum of 100,000 kg at £10/kg would cost £1 million. If the site used 80,000 kg and owed the full minimum, it would pay £12.50 per usable kilogram before any additional charges. Protium’s price and minimum volume remain undisclosed. Compare quotes at the same purity, pressure and point of use. Ask who pays for ammonia deliveries, process energy, site works, maintenance and replacement hydrogen during outages. If the gas leaves the cracker below the pressure your equipment needs, include the cost of installing and running a compressor. Allow for buffer storage if peak demand or downtime would interrupt supply.

## Overview

Fuel-cell-grade purity describes gas quality. To assess carbon intensity, ask how the ammonia was made and transported, how much energy cracking and purification use, and which stages the supplier includes in its calculation. If the supplier claims alignment with the UK Low Carbon Hydrogen Standard, ask for the assessment boundary and supporting figures. [UK Low Carbon Hydrogen Standard](https://www.gov.uk/government/publications/uk-low-carbon-hydrogen-standard-emissions-reporting-and-sustainability-criteria "GOV.UK – UK Low Carbon Hydrogen Standard")

## What should a UK site check before committing?

Start with a site walkover. Follow the route an ammonia delivery vehicle would take and check where it can turn and unload. Review the proposed plant and storage locations in relation to occupied buildings, air intakes and emergency access routes. In Great Britain, HSE guidance covers workplace fire and explosion risks under DSEAR and exposure to hazardous substances under COSHH. Establish the planning and permitting route for the location, layout and storage quantities before setting the timetable or committing to site works. [HSE guidance on DSEAR](https://www.hse.gov.uk/fireandexplosion/dsear.htm "GOV.UK – HSE guidance on DSEAR") · [HSE guidance on COSHH](https://www.hse.gov.uk/coshh/ "GOV.UK – HSE guidance on COSHH")

Agree who is responsible for each part of the installation, from ammonia unloading through to the hydrogen outlet and downstream equipment. Specify in the contract where to take gas samples, how long the commissioning test will run and what happens if purity, flow or pressure falls outside the agreed limits. Confirm who receives alarms, who can control the plant remotely and who attends out of hours if an alarm requires a site visit or communications fail. If the site already uses a [smart energy management system](https://kilowatts.uk/resources/smart-energy-management-systems-introduction/ "smart energy management systems introduction"), ask the supplier which operating data it can share with that system.

Use metered demand or a forecast that accounts for shifts, shutdowns and peak flow to price on-site and delivered supply. For each option, divide the annual cost, including site costs and any backup supply, by the kilograms the site expects to use. Compare that figure with the £10/kg headline. If the project also includes site-wide electricity upgrades, the guide to [solar for manufacturing sites](https://kilowatts.uk/resources/unlock-commercial-solar-for-manufacturing-in-the-uk/ "unlock commercial solar for manufacturing in the uk") covers how factory demand can shape a solar proposal.

## Is the HY5 suitable for homes or small businesses?

The HY5 is an industrial hydrogen supply unit. Its ammonia deliveries, dedicated storage, trained operators and emergency arrangements make it unsuitable for homes and balconies. A small business with occasional hydrogen demand can benchmark costs with a delivered quote based on its actual order volumes. On-site cracking is worth assessing where demand is recurring and the site can accommodate the equipment and deliveries.

If a small business is exploring on-site generation to cut its electricity bill, a [commercial solar payback assessment](https://kilowatts.uk/resources/can-solar-pay-for-itself-in-your-commercial-property/ "can solar pay for itself in your commercial property") can help it estimate savings from the electricity it would use on site.

Tags: [H power hy5 ammonia cracker](/tags/h-power-hy5-ammonia-cracker/ "H power hy5 ammonia cracker")[H power 10 per kg hydrogen offer](/tags/h-power-10-per-kg-hydrogen-offer/ "H power 10 per kg hydrogen offer")[Hy5 on site hydrogen supply](/tags/hy5-on-site-hydrogen-supply/ "Hy5 on site hydrogen supply")[Hy5 hydrogen production cost](/tags/hy5-hydrogen-production-cost/ "Hy5 hydrogen production cost")[Afc energy hy5 trading update](/tags/afc-energy-hy5-trading-update/ "Afc energy hy5 trading update")[H power protium hy5 deployment](/tags/h-power-protium-hy5-deployment/ "H power protium hy5 deployment")[Hy5 take or pay hydrogen contract](/tags/hy5-take-or-pay-hydrogen-contract/ "Hy5 take or pay hydrogen contract")[H power hydrogen minimum contract term](/tags/h-power-hydrogen-minimum-contract-term/ "H power hydrogen minimum contract term")[Hy5 hydrogen handover pressure](/tags/hy5-hydrogen-handover-pressure/ "Hy5 hydrogen handover pressure")[Hy5 cost per usable kilogram of hydrogen](/tags/hy5-cost-per-usable-kilogram-of-hydrogen/ "Hy5 cost per usable kilogram of hydrogen")

 [   Preferred on Google  ](https://www.google.com/preferences/source)

Solar comparison

## Compare solar for your property

Enter your postcode to assess your roof, compare solar options and get quotes from UK installers.

- Free postcode start
- Home, business and industrial
- RoboMo™ maps your roof

## See which panels fit your roof

Choose home, business or industrial, then enter your postcode. RoboMo maps the roof and ranks panel brands by fit.

- Home
- Business
- Industrial

UK postcode

Fast, free and no obligation to proceed.

**1. Postcode** Start the assessment for your property.

**2. Pin the roof** Mark the array on the map.

**3. Compare** RoboMo™ builds your options.

![Battery storage ROI calculator](/uploads_resolved/images/1012/320.webp)

Battery ROI tool

## See what a battery saves on your bill

Enter the day rate, off-peak rate and export rate. The calculator ranks batteries in the Kilowatts shop over 10 years. Home batteries also suit offices and small commercial sites.

[ **Home** Houses and flats ](/services/residential/renewable-energy/residential-solar-panel-installation/batteries/)[ **Business** Offices and small sites ](/services/commercial/renewable-energy/commercial-solar-panel-installation/batteries/)[ **Industrial** Factories and warehouses](/services/industrial/renewable-energy/industrial-solar-battery-storage/#get-quote-now)

[Shop batteries](/shop/kilowatts-uk/range/solar-batteries/)

 ## Related services

- [garden and patio heating](/services/residential/heating-cooling-ventilation/residential-patio-heater/)
- [app-controlled lighting for your home](/services/residential/smart-home-security/residential-smart-lighting/)
- [fitting an EV charger at home](/services/residential/electric-vehicle-infrastructure/residential-ev-charger-installation/)
- [residential heating and ventilation](/services/residential/heating-cooling-ventilation/)
- [electric underfloor heating for homes](/services/residential/heating-cooling-ventilation/residential-underfloor-heating/)
- [staircase lighting installation](/services/residential/outdoor-entertainment/residential-staircase-lighting/)

 Reading

## Sources and further reading

[![H-Power's 100 kW Hydrogen Generator Enters Commercial Service in the UK](/uploads_resolved/images/1251/320.webp)H-Power's 100 kW Hydrogen Generator Enters Commercial Service in the UK

H-Power's 100 kW LC100dc hydrogen generator starts paid work on a UK construction site. Compare usable output and fuel needs with diesel and grid power.

Read article](/resources/h-power-s-100-kw-hydrogen-generator-enters-commercial-service-in-the-uk/ "H-Power's 100 kW Hydrogen Generator Enters Commercial Service in the UK")[![Sleeved PPA vs private wire: UK business guide](/uploads_resolved/images/818/320.webp)Sleeved PPA vs private wire: UK business guide

A sleeved PPA needs a UK supplier that will sleeve volume on the public network. A private wire needs an adjacent cable, land rights and a lawful supply.

Read article](/resources/sleeved-ppa-vs-private-wire-uk/ "Sleeved PPA vs private wire: UK business guide")[How much does solar battery price per kwh cost in the UK? No single UK solar battery price per kWh exists. Divide matched supply-and-fit by usable kWh, not nameplate, and keep inverters and extras out. Read article](/resources/how-much-does-solar-battery-price-per-kwh-cost-in-the-uk/ "How much does solar battery price per kwh cost in the UK?")[![How much does solar battery cost per kwh cost in the UK?](/uploads_resolved/images/1009/320.webp)How much does solar battery cost per kwh cost in the UK?

UK solar battery cost per kWh is not a national rate. Divide the surveyed installed total by usable kilowatt-hours, not nameplate or supply-only prices.

Read article](/resources/how-much-does-solar-battery-cost-per-kwh-cost-in-the-uk/ "How much does solar battery cost per kwh cost in the UK?")

 Solar panels

## Solar panels

[![LONGi Hi-MO 6 Explorer 585W](/images/panels_resolved/longi-himo-6-explorer-585w/320.webp)

585WLONGi Hi-MO 6 Explorer 585W

LONGi Solar

LONGi Solar · 585W

View details](/services/residential/renewable-energy/residential-solar-panel-installation/solar-panels/longi-himo-6-explorer-585w/)[![AIKO Neostar 3S54 A495-MCE54Mb 495W](/images/panels/aiko-neostar-3s54-a495-mce54mb-495w.jpg)

495WAIKO Neostar 3S54 A495-MCE54Mb 495W

AIKO Solar

AIKO Solar · 495W

View details](/services/residential/renewable-energy/residential-solar-panel-installation/solar-panels/aiko-neostar-3s54-a495-mce54mb-495w/)[![DAS-DH108NE 530W](/images/panels/das-solar-das-dh108ne-500.jpg)

530WDAS-DH108NE 530W

DAS Solar

DAS Solar · 530W

View details](/services/residential/renewable-energy/residential-solar-panel-installation/solar-panels/das-solar-das-dh108ne-530/)

 Shop

## Shop

[![Pylontech US5000](/images/shop-products/pylontech-us5000/21d651f7d1372a9db5ff34594f57cde8/320.webp)

£1,600.00Pylontech US5000

View product](/shop/kilowatts-uk/battery-pylontech-us5000/)[![Fox ESS EP5 Battery](/images/shop-products/fox-ess-ep5/f2a041bb18179ce9d58b69858000bb64/320.webp)

£2,200.00Fox ESS EP5 Battery

View product](/shop/kilowatts-uk/battery-fox-ess-ep5-battery/)[![Fox ESS ECS 10kWh](/images/shop-products/fox-ess-ecs-10/cdbc05ff28a27fafcd4b504725959cae/320.webp)

£3,400.00Fox ESS ECS 10kWh

View product](/shop/kilowatts-uk/battery-fox-ess-ecs-10kwh/)

 Mo's Solar Mission

## Mo's Mission Nominations

[**Garlinge Primary School and Nursery**Garlinge Primary School and Nursery is a foundation primary school on Westfield Road in Margate, Kent, for children aged 3 to 11. It is m...](/solar-mission/garlinge-primary-school-nursery/)[**St Luke's Church of England Primary School**St Luke's Church of England Primary School is a voluntary controlled Church of England primary school on Jubilee Road in Formby, Merseysi...](/solar-mission/st-luke-s-church-of-england-primary-school/)[**Comberbach Nursery and Primary School**Comberbach Nursery and Primary School is a primary academy on Mather Drive in the village of Comberbach, near Northwich in Cheshire, for...](/solar-mission/comberbach-primary-school/)

 Locations

## Solar installation near you

Write for Kilowatts.uk

## Got a trade and something worth saying?

Write it here under your own name. Sign in, put a profile up, and start a guide. Pay only if you want more links from your articles out to your own site.

### Register

Create a Kilowatts.uk account, or sign in if you already have one.

### Author profile

Put your name, photo and experience on a public author page.

### Start creating

Write a guide or a blog. Free authors can put one followed link to their own site in articles each month.

[Write for us](/write-for-us/) [Register or sign in](/login/)

## Frequently Asked Questions

### Can H-Power's HY5 really make hydrogen for £10 per kg?

H-Power advertised £10 per kg for on-site hydrogen in November 2025, subject to a minimum contract term and take-or-pay provisions. The advertised price does not establish what it costs H-Power to produce a kilogram. The proposed Protium deployment announcement did not disclose a contract price.

### How can a take-or-pay clause affect the price I actually pay?

A take-or-pay clause can require you to pay for a minimum volume even if you use less. For example, if you pay for 100,000 kg at £10 per kg but use only 80,000 kg, your effective price is £12.50 per kg before any extra charges. Compare the minimum with your likely demand, including seasonal changes and shutdowns.

### How much hydrogen can the HY5 supply each day?

H-Power states a design maximum of 500 kg of fuel-cell-grade hydrogen per day. Independent customer-site figures for sustained output and availability are still unverified. Ask for metered output at your required purity and pressure, including performance during start-ups and low demand.

### What has H-Power agreed with Protium, and when could the HY5 be installed?

H-Power announced heads of terms for an initial two-year deployment at an unnamed customer site, with Protium expected to operate the unit. H-Power expected deployment to begin in the second half of 2027, subject to a definitive agreement and the necessary planning and permitting approvals.

### How should I compare the HY5 with delivered hydrogen?

Ask both suppliers to quote for the same purity and pressure at the point where your equipment uses the gas. Check who pays for site works, process energy, compression, storage and backup supply where applicable. Divide each option's total annual cost, including any minimum payments, by the kilograms you expect to use.

### Is hydrogen from the HY5 necessarily low-carbon?

Its carbon intensity depends on how the ammonia was made and transported and how much energy the cracker and purification system use. Fuel-cell grade describes gas purity. If the supplier claims alignment with the UK Low Carbon Hydrogen Standard, ask which stages its assessment covers and request the supporting emissions figures.

### What site checks should a UK business make before committing?

Check that delivery vehicles can reach and unload at the site and that there is suitable space for ammonia storage, the cracker and emergency access. Confirm which planning and permitting requirements apply to the proposed location and storage quantities. Agree who handles alarms and breakdowns, and how hydrogen purity, pressure and flow will be tested at commissioning.

### Is the HY5 suitable for a home or small business?

The HY5 is an industrial unit and is unsuitable for homes. It needs dedicated ammonia storage, delivery access, trained operators and emergency arrangements. A small business with occasional hydrogen demand can start by pricing delivered hydrogen for the quantities it actually expects to use.