# GeoPura Launches an 80kW Towable Hydrogen Generator - Can It Beat Diesel or Batteries?

![David Coleman](/uploads_resolved/images/261/320.webp)

[David Coleman](/authors/david-coleman/ "Author profile for David Coleman")Founder & Renewable Energy Author, kilowatts.uk

# GeoPura Launches an 80kW Towable Hydrogen Generator - Can It Beat Diesel or Batteries?

**Published:** 2026-11-21 17:36:49

**Updated:** 2026-11-21 09:37:36

Compare GeoPura’s 80 kW towable hydrogen generator with diesel and mobile batteries for UK sites, from fuel deliveries and recharging to running costs.

 [   Preferred on Google  ](https://www.google.com/preferences/source)

 ![Create a wide editorial photograph of an unbranded, enclosed towable hydrogen fuel-cell generator at a UK construction compound. Show temporary welfare cabins, a suitable towing…](/uploads_resolved/images/1256/320.webp)## Can the GeoPura HPU Agile-H beat diesel or batteries?

GeoPura’s 80 kW towable hydrogen generator can beat diesel on local air quality when a site needs sustained off-grid power and can rely on hydrogen deliveries. A mobile battery is usually simpler if it can supply the site until the next charge and recharge in the time available. Diesel remains practical where fuel and servicing are readily available and hydrogen deliveries are difficult. GeoPura opened UK pre-orders for the HPU Agile-H on 28 October 2026 and targeted first deliveries for the first quarter of 2027. [GeoPura launch announcement hosted by Ballard](https://blog.ballard.com/powergen/hpu-agile-h-ballard-launches-80kw-lightweight-towable-unit?hs_amp=true "Ballard – GeoPura launch announcement hosted by Ballard")

## What can the 80 kW hydrogen generator power?

GeoPura specifies 80 kW of continuous AC output at 400 V three-phase and 30 kWh of usable onboard battery capacity. The fuel cell turns hydrogen into electricity without combustion, and the battery helps the unit respond to changes in demand. The 80 kW rating tells you how much power the unit can supply continuously. The 30 kWh figure tells you how much energy the battery can store for use. Runtime also depends on how much fuel is available in the separate hydrogen supply and how quickly the unit uses it at the site’s actual loads. [GeoPura HPU Agile-H technical specification](https://www.geopura.com/wp-content/uploads/2026/10/AGILEH_TechSpec_REV04-1.pdf "GeoPura HPU Agile-H technical specification")

The unit could suit a construction compound with welfare cabins, lighting and tools, or a film location with lighting and production equipment. Ask a [qualified electrical contractor](https://kilowatts.uk/resources/how-to-choose-a-qualified-electrician-in-the-uk/ "how to choose a qualified electrician in the uk") to check which loads run together, how much current pumps or compressors draw on start-up, and how much current each phase carries. Several single-phase loads on the same phase can reach its current limit even if the total stays below 80 kW.

For temporary EV charging, account for chargers running alongside other equipment and check whether you can reduce charging power at busy times. If demand stays above 80 kW, price a larger supply or an engineered multi-unit installation. Confirm distribution, earthing and protection before mobilisation. [GeoPura HPU Agile-H technical specification](https://www.geopura.com/wp-content/uploads/2026/10/AGILEH_TechSpec_REV04-1.pdf "GeoPura HPU Agile-H technical specification")

## When hydrogen, diesel or mobile batteries make sense

Even a small overnight load can add substantially to daily energy use. A battery can power the site on its own if the available supply can recharge it in time. For hydrogen or diesel, check whether deliveries and on-site reserves can cover the same operating schedule.

## Overview

Both the fuel cell and the mobile battery avoid diesel exhaust at the point of use. When comparing greenhouse gas emissions, check whether the figures cover hydrogen production and delivery, diesel supply and combustion, and the electricity used to recharge the battery. If noise matters, compare measurements taken at similar loads and distances. Check where the equipment would sit in relation to homes, overnight workers or recording equipment.

## How much energy does a full site shift need?

A construction compound averaging 25 kW over a 10-hour shift uses 250 kWh. If overnight lighting, security and refrigeration average 3 kW for the remaining 14 hours, they add 42 kWh. That brings the illustrative total to 292 kWh delivered to site loads over 24 hours. Starting currents and brief periods when several loads run together still determine how much power the supply needs to deliver.

To cover the full 24 hours between charges, a mobile battery needs to deliver 292 kWh at its AC output plus any operating reserve the site requires. Replacing that energy in a separate six-hour charging window takes about 325 kWh at the charging input if 90% is recovered as usable AC output. That works out at roughly 54 kW on average. If charging overlaps overnight loads, ask the supplier to model how much power is left at the connection after those loads are served. The estimate should also account for the battery’s charge limit and any drop in charging rate as it nears full capacity.

Give hydrogen and diesel suppliers the same daytime and overnight loads, operating hours and expected peaks. Ask how many kilograms of hydrogen or litres of diesel the unit would use over the full cycle, how much usable fuel each delivery or refill provides, and what reserve is available before the next one. Use those figures to compare fuel cost and runtime. A full-load consumption figure gives a poor estimate if the site spends much of the day at part load.

## What can the remote dashboard do?

GeoPura lists remote monitoring, diagnostics and control for the Agile-H. Before ordering, agree who gets alarms outside working hours, which controls the site team can use and what response the service covers. If mobile coverage is patchy, ask which controls remain available on site when the dashboard loses contact. [GeoPura HPU Agile-H technical specification](https://www.geopura.com/wp-content/uploads/2026/10/AGILEH_TechSpec_REV04-1.pdf "GeoPura HPU Agile-H technical specification") If the site already uses [energy management software](https://kilowatts.uk/resources/smart-energy-management-systems-introduction/ "smart energy management systems introduction"), ask whether the dashboard can share monitoring data with it.

For backup power, agree which circuits must stay live and how long they can be without power. Have the electrical contractor specify the changeover and test it at commissioning with the loads you need to protect. Test the return to normal supply as well, especially if equipment needs to restart in a set order.

## What affects cost and deployment in the UK?

GeoPura offered Agile-H pricing on request at launch. Ask for an itemised quote covering purchase or hire, mobilisation, distribution equipment, fuel storage, deliveries, commissioning and support. Compare the total job cost with the cost of running diesel or a mobile battery on the same schedule. Check lead times, local hire availability and who provides cover if a fuel delivery is missed or the unit fails. [GeoPura launch announcement hosted by Ballard](https://blog.ballard.com/powergen/hpu-agile-h-ballard-launches-80kw-lightweight-towable-unit?hs_amp=true "Ballard – GeoPura launch announcement hosted by Ballard")

Walk the site with the supplier to agree where the trailer and separate hydrogen supply will sit. Check that the delivery vehicle can reach them during normal operations and work out how much fuel to hold in reserve if a delivery runs late. At workplaces in Great Britain, employers must assess and control relevant risks from flammable and pressurised gases under the Dangerous Substances and Explosive Atmospheres Regulations (DSEAR). [HSE guidance on DSEAR](https://www.hse.gov.uk/fireandexplosion/dsear-background.htm "GOV.UK – HSE guidance on DSEAR")

GeoPura lists a total weight of under 3,500 kg including the trailer. Before arranging a road move, ask for the trailer’s plated maximum authorised mass and check it against the tow vehicle’s limits and the driver’s licence entitlement. Plan access for hydrogen deliveries separately. [GeoPura HPU Agile-H technical specification](https://www.geopura.com/wp-content/uploads/2026/10/AGILEH_TechSpec_REV04-1.pdf "GeoPura HPU Agile-H technical specification") · [GOV.UK towing guidance](https://www.gov.uk/towing-with-car/what-you-can-tow "GOV.UK towing guidance")

## Where the Agile-H fits for businesses and temporary sites

For a business, farm or temporary worksite, measure electricity use over a representative working day and overnight. Use a site plan to record available grid capacity, equipment locations and delivery access. Get a quote for the Agile-H if the site needs sustained power without local diesel exhaust and can arrange dependable hydrogen deliveries. If the site has spare electrical capacity at predictable times, price a mobile battery. For longer projects, check the cost and lead time of a grid connection or upgrade. For a permanent business site with regular daytime demand, also [compare solar installation options](https://kilowatts.uk/services/commercial/renewable-energy/commercial-solar-panel-installation/compare/ "Compare commercial solar options") and estimate how much of that demand solar could cover.

For most homes, a towable unit with a separate hydrogen supply is disproportionate to the backup job. Identify the essential circuits and how many hours they need to run. When comparing home batteries, ask which circuits the system can supply [during a power cut](https://kilowatts.uk/resources/can-a-home-battery-work-during-a-power-cut/ "can a home battery work during a power cut") and how much usable capacity it can reserve for backup.

Tags: [Geopura hpu agile h](/tags/geopura-hpu-agile-h/ "Geopura hpu agile h")[Geopura hydrogen generator](/tags/geopura-hydrogen-generator/ "Geopura hydrogen generator")[Kw hydrogen generator](/tags/kw-hydrogen-generator/ "Kw hydrogen generator")[Towable hydrogen generator](/tags/towable-hydrogen-generator/ "Towable hydrogen generator")[Mobile hydrogen fuel cell power](/tags/mobile-hydrogen-fuel-cell-power/ "Mobile hydrogen fuel cell power")[Hydrogen generator versus diesel](/tags/hydrogen-generator-versus-diesel/ "Hydrogen generator versus diesel")[Hydrogen generator versus mobile batteries](/tags/hydrogen-generator-versus-mobile-batteries/ "Hydrogen generator versus mobile batteries")[Off grid hydrogen power](/tags/off-grid-hydrogen-power/ "Off grid hydrogen power")[Hydrogen generator air quality](/tags/hydrogen-generator-air-quality/ "Hydrogen generator air quality")[Geopura uk pre orders](/tags/geopura-uk-pre-orders/ "Geopura uk pre orders")

 [   Preferred on Google  ](https://www.google.com/preferences/source)

Solar comparison

## Compare solar for your property

Enter your postcode to assess your roof, compare solar options and get quotes from UK installers.

- Free postcode start
- Home, business and industrial
- RoboMo™ maps your roof

## See which panels fit your roof

Choose home, business or industrial, then enter your postcode. RoboMo maps the roof and ranks panel brands by fit.

- Home
- Business
- Industrial

UK postcode

Fast, free and no obligation to proceed.

**1. Postcode** Start the assessment for your property.

**2. Pin the roof** Mark the array on the map.

**3. Compare** RoboMo™ builds your options.

![Battery storage ROI calculator](/uploads_resolved/images/1012/320.webp)

Battery ROI tool

## See what a battery saves on your bill

Enter the day rate, off-peak rate and export rate. The calculator ranks batteries in the Kilowatts shop over 10 years. Home batteries also suit offices and small commercial sites.

[ **Home** Houses and flats ](/services/residential/renewable-energy/residential-solar-panel-installation/batteries/)[ **Business** Offices and small sites ](/services/commercial/renewable-energy/commercial-solar-panel-installation/batteries/)[ **Industrial** Factories and warehouses](/services/industrial/renewable-energy/industrial-solar-battery-storage/#get-quote-now)

[Shop batteries](/shop/kilowatts-uk/range/solar-batteries/)

 ## Related services

- [doorbell camera fitting for your home](/services/residential/smart-home-security/residential-doorbell-camera/)
- [fitted dehumidifiers for damp and condensation](/services/residential/heating-cooling-ventilation/residential-dehumidifier-installation/)
- [mirror lighting for homes](/services/residential/outdoor-entertainment/residential-mirror-lighting/)
- [outdoor patio heaters for homes](/services/residential/heating-cooling-ventilation/residential-patio-heater/)
- [home underfloor heating installation](/services/residential/heating-cooling-ventilation/residential-underfloor-heating/)

 Reading

## Sources and further reading

[![H-Power's 100 kW Hydrogen Generator Enters Commercial Service in the UK](/uploads_resolved/images/1251/320.webp)H-Power's 100 kW Hydrogen Generator Enters Commercial Service in the UK

H-Power's 100 kW LC100dc hydrogen generator starts paid work on a UK construction site. Compare usable output and fuel needs with diesel and grid power.

Read article](/resources/h-power-s-100-kw-hydrogen-generator-enters-commercial-service-in-the-uk/ "H-Power's 100 kW Hydrogen Generator Enters Commercial Service in the UK")[![UK Hydrogen-Hybrid Engine Begins Testing as a Drop-In Diesel Replacement](/uploads_resolved/images/989/320.webp)UK Hydrogen-Hybrid Engine Begins Testing as a Drop-In Diesel Replacement

Perkins is fitting a hydrogen-hybrid unit to a UK shredder as a diesel stand-in. It is a trial: tanks, refuelling and results are unpublished.

Read article](/resources/hydrogen-hybrid-industrial-engine-uk/ "UK Hydrogen-Hybrid Engine Begins Testing as a Drop-In Diesel Replacement")[![World's First Hydrogen-Engine Tanker Completes Voyage - But Was It Really Hydrogen-Only](/uploads_resolved/images/880/320.webp)World's First Hydrogen-Engine Tanker Completes Voyage - But Was It Really Hydrogen-Only

Japan's Kikomaru tanker completed a short hydrogen-engine voyage, but HVO pilot fuel means it was not hydrogen-only. What UK ports should note.

Read article](/resources/worlds-first-hydrogen-engine-tanker-completes-voyagebut-was-it-really-hydrogen-o/ "World's First Hydrogen-Engine Tanker Completes Voyage - But Was It Really Hydrogen-Only")[![Paper Mill Runs Industrial CHP on 100% Hydrogen: What HyCoFlex Proved](/uploads_resolved/images/1313/320.webp)Paper Mill Runs Industrial CHP on 100% Hydrogen: What HyCoFlex Proved

See how HyCoFlex generated power and process steam at full load on 100% renewable hydrogen, and what UK factories should check before a CHP retrofit.

Read article](/resources/paper-mill-runs-industrial-chp-on-100-hydrogen-what-hycoflex-proved/ "Paper Mill Runs Industrial CHP on 100% Hydrogen: What HyCoFlex Proved")

 Solar panels

## Solar panels

[![AIKO Neostar 3S54 A495-MCE54Mb 495W](/images/panels/aiko-neostar-3s54-a495-mce54mb-495w.jpg)

495WAIKO Neostar 3S54 A495-MCE54Mb 495W

AIKO Solar

AIKO Solar · 495W

View details](/services/residential/renewable-energy/residential-solar-panel-installation/solar-panels/aiko-neostar-3s54-a495-mce54mb-495w/)[![DAS-DH108NE 530W](/images/panels/das-solar-das-dh108ne-500.jpg)

530WDAS-DH108NE 530W

DAS Solar

DAS Solar · 530W

View details](/services/residential/renewable-energy/residential-solar-panel-installation/solar-panels/das-solar-das-dh108ne-530/)[500WNT12R/54GDF 500 W

GCL System Integration

GCL System Integration · 500W

View details](/services/residential/renewable-energy/residential-solar-panel-installation/solar-panels/gcl-system-integration-nt12r-54gdf-500/)

 Shop

## Shop

[![LuxpowerTek SNA 6K Off-Grid](/uploads_resolved/images/1230/320.webp)

£708.00LuxpowerTek SNA 6K Off-Grid

View product](/shop/kilowatts-uk/luxpowertek-sna-6k-off-grid/)[![LuxpowerTek SNA 14K Off-Grid](/uploads_resolved/images/1091/320.webp)

£1,474.00LuxpowerTek SNA 14K Off-Grid

View product](/shop/kilowatts-uk/luxpowertek-sna-14k-off-grid/)[![Growatt MIN 10000 TL-X2](/images/shop/inverter-growatt-min-10000-tl-x2-13.jpg)

£870.00Growatt MIN 10000 TL-X2

View product](/shop/kilowatts-uk/inverter-growatt-min-10000-tl-x2-13/)

 Mo's Solar Mission

## Mo's Mission Nominations

[**Garlinge Primary School and Nursery**Garlinge Primary School and Nursery is a foundation primary school on Westfield Road in Margate, Kent, for children aged 3 to 11. It is m...](/solar-mission/garlinge-primary-school-nursery/)[**St Luke's Church of England Primary School**St Luke's Church of England Primary School is a voluntary controlled Church of England primary school on Jubilee Road in Formby, Merseysi...](/solar-mission/st-luke-s-church-of-england-primary-school/)[**Comberbach Nursery and Primary School**Comberbach Nursery and Primary School is a primary academy on Mather Drive in the village of Comberbach, near Northwich in Cheshire, for...](/solar-mission/comberbach-primary-school/)

 Locations

## Solar installation near you

Write for Kilowatts.uk

## Got a trade and something worth saying?

Write it here under your own name. Sign in, put a profile up, and start a guide. Pay only if you want more links from your articles out to your own site.

### Register

Create a Kilowatts.uk account, or sign in if you already have one.

### Author profile

Put your name, photo and experience on a public author page.

### Start creating

Write a guide or a blog. Free authors can put one followed link to their own site in articles each month.

[Write for us](/write-for-us/) [Register or sign in](/login/)

## Frequently Asked Questions

### What can the GeoPura HPU Agile-H power?

It delivers up to 80 kW continuously at 400 V three-phase and could power a construction compound or temporary film set. Ask an electrical contractor to check which loads run together, the starting current of equipment such as pumps, and the load on each phase. One phase can reach its limit even when total demand is below 80 kW.

### How long can the Agile-H run between hydrogen deliveries?

Runtime depends on the usable hydrogen in the separate fuel supply and how much the unit consumes at your actual loads. Its 30 kWh onboard battery helps it respond to changes in demand. Give the supplier your daytime and overnight load profile and ask for an estimate of fuel use, delivery frequency and the reserve available if a delivery is late.

### When is hydrogen a better choice than diesel or a mobile battery?

Hydrogen can suit a site that needs sustained off-grid power without diesel exhaust on site and can arrange reliable fuel deliveries. A mobile battery is usually simpler if it can cover demand between charges and recharge in the time available. Diesel can be practical where refuelling and servicing are readily available. For a greenhouse gas comparison, include hydrogen production and delivery, diesel supply and combustion, and the electricity used to recharge the battery.

### Is the Agile-H suitable for home backup during a power cut?

For most homes, an 80 kW three-phase trailer with a separate hydrogen supply is larger than the backup job requires. List the essential circuits and work out how long they need to stay powered. If you compare home batteries, ask which circuits each system can supply during an outage and how much usable energy it can reserve for backup.

### How much does the Agile-H cost and when can I get one in the UK?

GeoPura offered pricing on request at launch and targeted first deliveries for the first quarter of 2027. Ask GeoPura to confirm the current lead time and whether hire is available in your area. Request an itemised quote covering transport, electrical distribution, commissioning, hydrogen storage and deliveries, and support. Compare the total cost with diesel or battery power over the same operating schedule.

### What should I check before towing or setting up the Agile-H?

Ask for the trailer’s plated maximum authorised mass and check it against the tow vehicle’s limits and the driver’s licence entitlement. Agree where the trailer and separate hydrogen supply will sit, and make sure the delivery vehicle can reach them during normal operations. Have your electrical contractor confirm the site’s distribution, earthing and protection before mobilisation.

### Can the Agile-H provide backup power for a business?

It could provide backup if the essential loads fit its output and the fuel supply can cover the outage you are planning for. Agree which circuits need backup and how long they can tolerate an interruption. Ask your electrical contractor to specify the changeover and test both the switch to backup and the return to normal supply with the equipment you need to protect.