# The North Sea's Offshore Hydrogen Pilot Says the Electrolyser Was Not the Hard Part

![David Coleman](/uploads_resolved/images/261/320.webp)

[David Coleman](/authors/david-coleman/ "Author profile for David Coleman")Founder & Renewable Energy Author, kilowatts.uk

# The North Sea's Offshore Hydrogen Pilot Says the Electrolyser Was Not the Hard Part

**Published:** 2026-11-23 23:08:35

**Updated:** 2026-11-23 15:09:20

See what the North Sea’s PosHYdon offshore hydrogen pilot taught UK developers about integrating platform equipment, assigning control and exporting gas.

 [   Preferred on Google  ](https://www.google.com/preferences/source)

 ![Hero](/uploads_resolved/images/1354/320.webp)## PosHYdon offshore hydrogen lessons for the UK North Sea

The PosHYdon pilot showed that an operating offshore platform could produce hydrogen and export it in its existing gas stream. At Q13a-A, a working oil and gas platform in the Dutch North Sea, getting the equipment, platform, pipeline and operators to work together proved harder than running the 1 MW-class electrolyser. UK project teams should settle three questions before ordering equipment. Who has authority over the whole system? How will the plant be powered? Who will accept the gas? [TNO’s PosHYdon findings](https://www.tno.nl/en/newsroom/2026/11/poshydon-pilot-provides-practical/ "Tno – TNO’s PosHYdon findings")

## What the pilot proved about producing hydrogen offshore

An electrolyser uses electricity to split water into hydrogen and oxygen. At Q13a-A, the team treated seawater before feeding it into the electrolyser. The platform then blended the hydrogen into its natural gas stream and sent it to shore through an existing pipeline under the conditions agreed for the trial. For more on the production process, see the guide to [making hydrogen from seawater](https://kilowatts.uk/resources/seawater-hydrogen-electrolysis-system-uk/ "seawater hydrogen electrolysis system uk"). [TNO’s PosHYdon project overview](https://www.tno.nl/en/sustainable/industry/carbon-neutral-industry/clean-hydrogen-production/green-hydrogen-from-seawater-trial-plant/ "Tno – TNO’s PosHYdon project overview")

The pilot secured approval to raise the permitted hydrogen share from 0.02% to 0.5% by volume after assessing the effects on infrastructure, gas quality and metering. Those limits applied to the Dutch trial. A UK project would need its own assessment of the pipeline and receiving facilities, including what gas composition the receiving operator can accept and how it will be measured. [TNO’s account of the blending approval](https://www.tno.nl/en/newsroom/2026/11/poshydon-pilot-provides-practical/ "Tno – TNO’s account of the blending approval")

## Why remote control needed clear operating authority

Remote supervision is harder when different suppliers provide the water treatment, electrolysis and gas export equipment. If the export system stops accepting gas, the hydrogen plant has to respond as part of the wider platform operation. Before ordering equipment, agree which alarms reach the control room, who can start or stop production, what happens if communications fail and who can authorise a restart. [PosHYdon final report](https://publications.tno.nl/publication/34646970/8IPFXVtN/TNO-2026-poshydon.pdf "Tno – PosHYdon final report")

The consortium’s final report recommends giving one organisation responsibility for the whole system and the authority to make decisions across suppliers and operators. That organisation can require a joint test onshore, with the equipment connected as it will be offshore. The teams can then check how alarms and shutdowns work across the system. Finding a mismatch onshore gives suppliers time to fix it before repairs depend on offshore access and weather windows. [PosHYdon final report](https://publications.tno.nl/publication/34646970/8IPFXVtN/TNO-2026-poshydon.pdf "Tno – PosHYdon final report") · [Nexstep’s account of the onshore trial](https://www.nexstep.nl/successful-start-of-onshore-test-poshydon-a-world-first-in-the-north-sea/ "Nexstep – Nexstep’s account of the onshore trial")

## How much hydrogen can a 1 MW pilot produce?

The Netherlands Enterprise Agency gives a design figure of up to about 400 kg of hydrogen per day for PosHYdon. The 1 MW rating describes the electrolyser’s electrical power. The daily figure describes how much hydrogen it was designed to produce. To estimate annual deliveries, you need operating hours, output at different loads, downtime and measurements of how much hydrogen entered the export stream. [Netherlands Enterprise Agency offshore wind innovation guide](https://english.rvo.nl/sites/default/files/2025-11/Dutch%20Offshore%20Wind%20Innovation%20Guide%202026.pdf "Rvo – Netherlands Enterprise Agency offshore wind innovation guide")

For a cost comparison, ask how much electricity the whole installation uses per kilogram delivered, including water treatment and cooling. Factor in power prices, platform modifications, offshore installation and maintenance, and any work needed on the export route or at the receiving plant. UK retrofit costs and service life depend on the host platform, the power supply and how much export infrastructure can be reused. The pilot findings leave both questions open for UK projects. [PosHYdon final report](https://publications.tno.nl/publication/34646970/8IPFXVtN/TNO-2026-poshydon.pdf "Tno – PosHYdon final report")

## What UK projects should check before choosing an electrolyser

Start with the proposed platform and the terminal that would receive the gas. Even with spare deck space, a platform may lack the electrical capacity, lifting access or maintenance clearance the plant needs. A nearby pipeline is useful only if the receiving terminal can accept the proposed gas composition. Finding either constraint early can change the size or location of the project and may make onshore electrolysis worth comparing. [North Sea Transition Authority offshore hydrogen overview](https://www.nstauthority.co.uk/the-move-to-net-zero/offshore-hydrogen/ "Co – North Sea Transition Authority offshore hydrogen overview")

## Overview

Check the consent route while the design is still flexible. The Health and Safety Executive explains how offshore safety requirements apply to hydrogen production, including the relevant safety case and emergency arrangements. The North Sea Transition Authority authorises the construction and use of hydrogen pipelines on the UK Continental Shelf. Marine and environmental permissions depend on where the work takes place and what it involves. Confirm which requirements apply to the host installation and export route before scheduling work on the assumption that existing infrastructure can be reused. [HSE guidance on offshore hydrogen production](https://www.hse.gov.uk/carboncapture/regulating-ccs.htm "GOV.UK – HSE guidance on offshore hydrogen production") · [NSTA pipeline consents](https://www.nstauthority.co.uk/regulatory-information/licensing-and-consents/consents/ "Co – NSTA pipeline consents") · [Scottish Government guidance on offshore hydrogen consenting](https://www.gov.scot/publications/hydrogen-planning-consenting-guidance/pages/8/ "Gov – Scottish Government guidance on offshore hydrogen consenting")

## What offshore hydrogen could mean for UK homes and businesses

The findings are most relevant to offshore developers and industrial buyers with a defined need for hydrogen, such as a process that already uses it as a feedstock. A buyer needs to specify purity, delivery pressure and how much variation in supply its process can tolerate. A small share of hydrogen blended into natural gas and a dedicated hydrogen supply at an agreed purity serve different uses. For another industrial application, see [how hydrogen hybrid engines work](https://kilowatts.uk/resources/hydrogen-hybrid-industrial-engine-uk/ "hydrogen hybrid industrial engine uk"). [North Sea Transition Authority offshore hydrogen overview](https://www.nstauthority.co.uk/the-move-to-net-zero/offshore-hydrogen/ "Co – North Sea Transition Authority offshore hydrogen overview") · [TNO’s PosHYdon findings](https://www.tno.nl/en/newsroom/2026/11/poshydon-pilot-provides-practical/ "Tno – TNO’s PosHYdon findings")

The pilot offers no basis for assuming that homes, farms or small businesses will receive hydrogen. If you’re weighing up solar, a battery or a heat pump, start with your property’s electricity and heating demand. For balcony solar, check shading, mounting options and the building’s requirements. If you run a farm or business, check when you use the most electricity and whether those hours coincide with solar generation before you [compare solar for your business](https://kilowatts.uk/services/commercial/renewable-energy/commercial-solar-panel-installation/compare/ "Compare commercial solar options"). Kilowatts’ [electrical installer directory](https://kilowatts.uk/electrical-companies/ "electrical companies") can help you explore options for your property and energy use.

Tags: [Poshydon hydrogen pilot](/tags/poshydon-hydrogen-pilot/ "Poshydon hydrogen pilot")[North sea offshore hydrogen](/tags/north-sea-offshore-hydrogen/ "North sea offshore hydrogen")[Q13a a platform](/tags/q13a-a-platform/ "Q13a a platform")[Offshore electrolysis](/tags/offshore-electrolysis/ "Offshore electrolysis")[Offshore platform integration](/tags/offshore-platform-integration/ "Offshore platform integration")[Hydrogen blending](/tags/hydrogen-blending/ "Hydrogen blending")[Offshore gas pipeline export](/tags/offshore-gas-pipeline-export/ "Offshore gas pipeline export")[Offshore electrolyser power supply](/tags/offshore-electrolyser-power-supply/ "Offshore electrolyser power supply")[Gas acceptance for hydrogen blends](/tags/gas-acceptance-for-hydrogen-blends/ "Gas acceptance for hydrogen blends")[Uk north sea hydrogen lessons](/tags/uk-north-sea-hydrogen-lessons/ "Uk north sea hydrogen lessons")

 [   Preferred on Google  ](https://www.google.com/preferences/source)

Solar comparison

## Compare solar for your property

Enter your postcode to assess your roof, compare solar options and get quotes from UK installers.

- Free postcode start
- Home, business and industrial
- RoboMo™ maps your roof

## See which panels fit your roof

Choose home, business or industrial, then enter your postcode. RoboMo maps the roof and ranks panel brands by fit.

- Home
- Business
- Industrial

UK postcode

Fast, free and no obligation to proceed.

**1. Postcode** Start the assessment for your property.

**2. Pin the roof** Mark the array on the map.

**3. Compare** RoboMo™ builds your options.

![Battery storage ROI calculator](/uploads_resolved/images/1012/320.webp)

Battery ROI tool

## See what a battery saves on your bill

Enter the day rate, off-peak rate and export rate. The calculator ranks batteries in the Kilowatts shop over 10 years. Home batteries also suit offices and small commercial sites.

[ **Home** Houses and flats ](/services/residential/renewable-energy/residential-solar-panel-installation/batteries/)[ **Business** Offices and small sites ](/services/commercial/renewable-energy/commercial-solar-panel-installation/batteries/)[ **Industrial** Factories and warehouses](/services/industrial/renewable-energy/industrial-solar-battery-storage/#get-quote-now)

[Shop batteries](/shop/kilowatts-uk/range/solar-batteries/)

 ## Related services

- [LED lighting upgrades for homes](/services/residential/lighting/residential-led-lighting-upgrades/)
- [ground source heat pump installation](/services/residential/heating-cooling-ventilation/residential-ground-source-heat-pump-installation/)
- [fitted downlights for your home](/services/residential/lighting/residential-downlight-installation/)
- [home EV charger installation](/services/residential/electric-vehicle-infrastructure/residential-ev-charger-installation/)
- [LED stair lighting](/services/residential/outdoor-entertainment/residential-staircase-lighting/)

 Reading

## Sources and further reading

[![Hadean's Tubular Electrolyser Targets 30% Less Electricity for Green Hydrogen - Now It Faces a Steelworks Test](/uploads_resolved/images/1367/320.webp)Hadean's Tubular Electrolyser Targets 30% Less Electricity for Green Hydrogen - Now It Faces a Steelworks Test

See how Hadean’s tubular electrolyser pilot for steel annealing in Victoria will test a 30% electricity saving and what UK manufacturers should measure.

Read article](/resources/hadean-s-tubular-electrolyser-targets-30-less-electricity-for-green-hydrogen-now/ "Hadean's Tubular Electrolyser Targets 30% Less Electricity for Green Hydrogen - Now It Faces a Steelworks Test")[![Europe's Largest 100% Hydrogen-Ready Gas Turbine Starts a 34 MW Trial - The Efficiency Questions](/uploads_resolved/images/1361/320.webp)Europe's Largest 100% Hydrogen-Ready Gas Turbine Starts a 34 MW Trial - The Efficiency Questions

See what Lingen’s 34 MW hydrogen gas turbine trial could reveal about net grid export, round-trip efficiency and backup power for the UK grid.

Read article](/resources/europe-s-largest-100-hydrogen-ready-gas-turbine-starts-a-34-mw-trial-the-efficie/ "Europe's Largest 100% Hydrogen-Ready Gas Turbine Starts a 34 MW Trial - The Efficiency Questions")[![Can H-Power's HY5 Ammonia Cracker Really Make Hydrogen for GBP10 per kg?](/uploads_resolved/images/1399/320.webp)Can H-Power's HY5 Ammonia Cracker Really Make Hydrogen for GBP10 per kg?

See what H-Power’s HY5 ammonia cracker offer covers and how minimum volumes and compression affect the £10/kg hydrogen price for UK industrial sites.

Read article](/resources/can-h-power-s-hy5-ammonia-cracker-really-make-hydrogen-for-gbp10-per-kg/ "Can H-Power's HY5 Ammonia Cracker Really Make Hydrogen for GBP10 per kg?")[![H-Power's 100 kW Hydrogen Generator Enters Commercial Service in the UK](/uploads_resolved/images/1251/320.webp)H-Power's 100 kW Hydrogen Generator Enters Commercial Service in the UK

H-Power's 100 kW LC100dc hydrogen generator starts paid work on a UK construction site. Compare usable output and fuel needs with diesel and grid power.

Read article](/resources/h-power-s-100-kw-hydrogen-generator-enters-commercial-service-in-the-uk/ "H-Power's 100 kW Hydrogen Generator Enters Commercial Service in the UK")

 Solar panels

## Solar panels

[500WNT12R/54GDF 500 W

GCL System Integration

GCL System Integration · 500W

View details](/services/residential/renewable-energy/residential-solar-panel-installation/solar-panels/gcl-system-integration-nt12r-54gdf-500/)[![DAS-DH108NE 530W](/images/panels/das-solar-das-dh108ne-500.jpg)

530WDAS-DH108NE 530W

DAS Solar

DAS Solar · 530W

View details](/services/residential/renewable-energy/residential-solar-panel-installation/solar-panels/das-solar-das-dh108ne-530/)[![LONGi Hi-MO 6 Explorer 585W](/images/panels_resolved/longi-himo-6-explorer-585w/320.webp)

585WLONGi Hi-MO 6 Explorer 585W

LONGi Solar

LONGi Solar · 585W

View details](/services/residential/renewable-energy/residential-solar-panel-installation/solar-panels/longi-himo-6-explorer-585w/)

 Shop

## Shop

[![SolaX Triple Power T58 5.8 kWh Master V3](/uploads_resolved/images/1239/320.webp)

£1,534.91SolaX Triple Power T58 5.8 kWh Master V3

View product](/shop/kilowatts-uk/battery-solax-triple-power-5-8/)[![SolaX Triple Power T58 11.6 kWh Kit V2](/uploads_resolved/images/1282/320.webp)

£4,662.00SolaX Triple Power T58 11.6 kWh Kit V2

View product](/shop/kilowatts-uk/battery-solax-triple-power-11-6/)[£82.32GCL System Integration NT12R/54GDF 505 W

View product](/shop/kilowatts-uk/panel-gcl-system-integration-nt12r-54gdf-505/)

 Mo's Solar Mission

## Mo's Mission Nominations

[**Garlinge Primary School and Nursery**Garlinge Primary School and Nursery is a foundation primary school on Westfield Road in Margate, Kent, for children aged 3 to 11. It is m...](/solar-mission/garlinge-primary-school-nursery/)[**St Luke's Church of England Primary School**St Luke's Church of England Primary School is a voluntary controlled Church of England primary school on Jubilee Road in Formby, Merseysi...](/solar-mission/st-luke-s-church-of-england-primary-school/)[**Comberbach Nursery and Primary School**Comberbach Nursery and Primary School is a primary academy on Mather Drive in the village of Comberbach, near Northwich in Cheshire, for...](/solar-mission/comberbach-primary-school/)

 Locations

## Solar installation near you

Write for Kilowatts.uk

## Got a trade and something worth saying?

Write it here under your own name. Sign in, put a profile up, and start a guide. Pay only if you want more links from your articles out to your own site.

### Register

Create a Kilowatts.uk account, or sign in if you already have one.

### Author profile

Put your name, photo and experience on a public author page.

### Start creating

Write a guide or a blog. Free authors can put one followed link to their own site in articles each month.

[Write for us](/write-for-us/) [Register or sign in](/login/)

## Frequently Asked Questions

### What did the PosHYdon offshore hydrogen pilot prove?

A working gas platform in the Dutch North Sea used treated seawater and electricity to make hydrogen. The platform blended the hydrogen into its natural gas stream and sent it to shore through an existing pipeline under the conditions agreed for the trial.

### Why was the electrolyser the easier part of the pilot?

The water treatment, electrolyser and gas export systems had to work together, including when the pipeline could no longer accept gas. Operators needed clear authority over alarms, shutdowns and restarts. The pilot team recommended putting one organisation in charge of the whole system and testing the connected equipment onshore before installation.

### How much hydrogen was the 1 MW electrolyser designed to produce?

PosHYdon was designed to produce up to about 400 kg of hydrogen a day. The 1 MW rating describes the electrolyser’s electrical power. Estimating annual deliveries requires operating hours, output at different loads, downtime and measurements of how much hydrogen reached the export stream.

### Could UK projects blend hydrogen into an existing offshore gas pipeline?

It depends on the pipeline and the facilities that receive the gas. PosHYdon secured approval for a hydrogen share of up to 0.5% by volume under the Dutch trial conditions. A UK project would need to check pipeline suitability, the receiving terminal’s gas specification, metering and the permissions that apply.

### What should a UK developer check before choosing an offshore electrolyser?

Check the platform’s available electrical capacity, including power for water treatment and cooling. Confirm that the deck can carry the equipment and that crews can lift it into place and reach it for maintenance. Agree who will accept the gas and how the whole installation will be controlled.

### What should an industrial buyer check before agreeing to buy offshore hydrogen?

Set the purity and delivery pressure your process needs, and decide how much variation in supply it can tolerate. Check whether the supplier can deliver hydrogen at that specification. If your process needs a dedicated hydrogen supply, a small share blended into natural gas serves a different use.

### Does the pilot mean UK homes will get hydrogen for heating?

The Dutch trial provides no basis for expecting UK homes to receive hydrogen for heating. If you’re considering solar panels, a battery or a heat pump, compare your options using your home’s current electricity and heating needs.