Kilowatts.uk Partner Network
Customers look for independent proof before they choose a renewable energy company. A Kilowatts UK presence gives your business visible third-party recognition, strengthens its credibility, and helps more people find you when they are ready to buy.
Applying does not commit you. Commission is a percentage of the job, excluding VAT, and only when the work goes ahead. Silver and Silver+ start at 10%. Gold starts at 5%.
While your competitors build visibility, authority and trust, can your business afford to remain invisible?
Already live
This is not a mock-up. These businesses already show the Kilowatts UK verified partner mark in their website footer.
The mark
This is the mark customers look for on a Kilowatts UK listing. It tells them the business has been independently listed and vetted by Kilowatts UK.
Use of the badge is part of the partnership. It is a trust signal for customers, not a search-ranking promise.
Partners can put the badge on their own site so visitors see the same independent mark they will find on Kilowatts UK.
What you get
This is more than a directory listing. We build a visible trail of trust around your company, helping potential customers verify who you are, understand what you offer, and find you when they are actively searching for renewable energy services.
Silver, Silver+ and Gold each publish a directory listing. Gold adds a customisable profile.
Gold Membership includes the Kilowatts UK verified partner mark on the listing and on your own site.
Gold Membership includes a written company feature: who you are, what you install, and the area you cover.
Gold gets a followed link from your profile, plus mentions from our pages and articles. Silver and Silver+ get one unfollowed profile link.
Gold Membership includes residential location pages, commercial pages, industrial pages and service pages.
Commission is a percentage of the job value, excluding VAT, and only when the work goes ahead. Silver and Silver+ start at 10%. Gold starts at 5%. Each rate falls by one percentage point for every 20 published Gold partners.
Leads
Partnership is built around work you actually want. After the agreement for your level is signed, you choose the catchment and the services, and matching leads arrive by email. You choose which ones to quote.
Flower Turbine partners receive matching Flower Turbine enquiries from the public quoting tool, by email. There is no charge per lead. Commission is due only if the job goes ahead, at the membership rate. This routing is for Flower Turbine partners only. The Flower Turbines installer flag is what opens the quoting tool and these leads.
You remain the supplier. You keep pricing, scope and delivery. When a quoted job goes ahead, Silver and Silver+ start at 10% of Gross Contract Value excluding VAT and Gold starts at 5%. Both fall by one percentage point for every 20 published Gold partners. At 100, Silver and Silver+ pay 5% and Gold pays 0%, unless a different rate is agreed in writing.
Membership
Commission is a percentage of Gross Contract Value, excluding VAT, and only when the work goes ahead. It is never charged per lead. Silver and Silver+ start at 10% and Gold starts at 5%. Each rate falls by one percentage point for every 20 published Gold partners. At 100 published Gold partners, Silver and Silver+ pay 5% and Gold pays 0%.
Silver
No administration fee. The partner agreement is required before leads are released.
Silver+
One-off administration fee. VAT is 20%.
Gold
One-off administration fee. VAT is 20%.
Every new verified partner profile, published feature and trusted recommendation strengthens that company’s position, and brings the whole network closer to a lower commission rate. Exclusive catchments are limited. The sooner you join, the sooner you start building the visibility and independent credibility customers already expect.
Join before your competitors do
Mo’s Solar Mission
Mo’s Solar Mission is a community-powered video series following the challenge of crowdfunding, sourcing and installing a complete solar system for a deserving primary school. Inspired by the energy of Challenge Anneka, it brings installers, manufacturers, suppliers, sponsors and the public together to make something useful happen.
Partners can contribute equipment, installation time, sponsorship, technical expertise, or video production and promotion.
See the mission, nominations and leaderboard.
Flower Turbines
Kilowatts UK works with Flower Turbines to develop opportunities for Power Tower technology across the UK. We are expanding the national network and looking for approved installers, regional resellers, commercial introducers and strategic partners.
Exclusive territories are available in selected parts of the UK. The focus is commercial sites, local visibility and a long-term partnership.
Secure your place in the network
Who
Solar, battery storage, wind, EV charging, heat pumps, and hybrid systems.
Domestic, commercial and industrial electrical services and compliance work.
Design, surveying, project management and energy consultancy.
Business gas and electricity supply specialists, where applicable, and Flower Turbines introducers.
Transparency
On introduced leads, the partner quotes the customer. The installation contract is between the customer and that partner. We do not buy those jobs and resell them, and we do not add a hidden markup to the partner’s quote. Commission is due only if the work goes ahead, at the membership rate.
Silver Membership has no administration fee. Silver+ is a one-off £1,500 plus VAT. Gold is a one-off £3,000 plus VAT. VAT is 20%. Commission on work that goes ahead starts at 10% for Silver and Silver+ and 5% for Gold, of Gross Contract Value excluding VAT. Each rate falls by one percentage point for every 20 published Gold partners. At 100, Silver and Silver+ pay 5% and Gold pays 0%, unless a different rate is agreed in writing. CMS import into your own system is a separate bespoke setup, priced on application.
Kilowatts.uk also sells some work itself, including packaged solar, Flower Turbines, and managed projects. On those jobs we may act as commercial agent or principal and subcontract installation, as set out in our terms. That arrangement is stated before any binding agreement or payment. We may also act as a broker for business gas and electricity supply contracts, where commissions are paid by suppliers under standard industry practice.
Agreements
Each level has its own agreement. The PDF opens in a new tab. Fill in the highlighted company details before it is signed.
Free. Profile, non-renewable leads, and commission from 10% to 5%.
Silver agreement£1,500 plus VAT. Adds renewable energy leads. Commission from 10% to 5%.
Silver+ agreement£3,000 plus VAT. Full profile, all lead types, new leads first, and commission from 5% to 0%.
Gold agreementBuild your Kilowatts UK presence before the next installer in your area does. 0800 009 6058
Claim Your TerritorySolar comparison
Enter your postcode to assess your roof, compare solar options and connect with trusted UK installers.
Choose home, business or industrial, then enter your postcode. RoboMo maps the roof and ranks panel brands by fit.
1. Postcode Start the assessment for your property.
2. Pin the roof Mark the array on the map.
3. Compare RoboMo™ builds your options.
Battery ROI tool
Enter the day rate, off-peak rate and export rate. The calculator ranks batteries in the Kilowatts shop over 10 years. Home batteries also suit offices and small commercial sites.
Authorised UK partner
Choose a location, configure Flower Turbines and see estimated annual generation from location-specific wind data. No account required.
Open the designer and lay out turbines on your site.
1. Postcode Open the designer for your site.
2. Layout Place turbines in the space you have.
3. Forecast See estimated annual generation.
Live help
Talk to RoboMo™ and get instant answers.
Live chat