Industrial system builder
Choose your equipment and save the quote to your project.
Build your system
Start with solar panels or battery storage. You can combine them later.
Sign in to build a system
Finish this system when the equipment and tariff are ready.
- Choose panels
Solar panels
Added Next Optional - Choose a battery
Battery storage
Added Next Optional - Choose an inverter
Inverter
Added Next Optional - Calculated automatically from your selected panels
Scaffolding
Estimated Next Optional - Add your tariff and annual use
Energy tariff and usage
Saved Next Optional - No backup
Backup power
Backup power
Choose what you want to run during a power cut.
Current choice No backup
Choose compatible storage and an inverter to see the backup options for your supply.
An installer confirms which loads the system can support during an outage.
Choose a compatible gateway manually
Find an inverter for your layout
Review the wiring checks and choose an inverter for this system.
Inverter selection
Choose an inverter
Choose a model from the list to see the available wiring checks.
String layout
Panels wired in series form a string. Each proposed string uses panels from one roof face.
Startup voltage
Each string needs enough open-circuit voltage to start the inverter. The figures use the panel’s standard test conditions.
MPPT inputs
Each tracker adjusts its string’s operating voltage as light changes. Independent inputs let different roof faces work separately.
- Panels in string
- Open-circuit voltage
- Startup minimum
- Tracker
- Operating reference
- Operating range
In the system now
Add another battery, or choose the panels.
Live help
Need help right now?
Talk to RoboMo™ and get instant answers.
