Explore how homes in Oldham are performing with Home solar panel installation. Real comparison data reveals typical system sizes, generation levels, and the level of savings being achieved locally.
Explore residential solar panel installation in Oldham. Compare your roof, electricity use and local installation options.
Explore solar panel installation in Oldham.
Last checked: 4 November 2026. Every figure below cites its source and date.
Oldham is a terraced-house borough. The Census counts 93,140 households, of which 38.5% are terraced, the largest share in Greater Manchester, with 35.9% semi-detached, 13.3% detached and 11.2% flats (ONS TS044). 31.5% own outright and 21.2% rent socially (ONS TS054). A typical Oldham terrace has one main roof slope, so the direction it faces sets most of the output.
County comparison: solar panels across Greater Manchester.
Oldham solar output by roof direction
Modelled yield in Oldham, PVGIS 5.3, 35° slope
| Facing | kWh/kWp a year (PVGIS estimate) | 3 kWp, kWh a year (estimate) |
| South | 837 | 2,511 |
| South-east | 796 | 2,388 |
| South-west | 788 | 2,364 |
| East | 684 | 2,052 |
| West | 673 | 2,019 |
| North | 482 | 1,446 |
Oldham’s south-facing figure is 837 kWh per kWp. A terrace with front and back slopes facing east and west still gets about 2,036 kWh from 3 kWp, against 2,511 kWh for the same size facing south; a north slope gives just 482 per kWp. December output is about 25 kWh per south kWp, June about 106.
Numbers above: PVGIS 5.3 run on 4 November 2026 for Oldham (53.541, -2.118); SARAH3 satellite data, panels tilted 35°, 14% loss allowance, roof mounting, horizon from the terrain model. Unshaded roof assumed.
Oldham price examples
| Option | Example price (estimate) | Worked from |
| 3 kWp, solar only | ≈ £5,400 | North West £1,799.83/kW (under 4 kW) |
| 3 kWp + 5 kWh battery | ≈ £10,000 | plus about £4,600 for 5 kWh |
| 5 kWp, solar only | ≈ £8,100 | North West £1,626.86/kW (4–10 kW) |
The zero VAT rate for residential solar and batteries runs to 31 March 2027 (HMRC Notice 708/6); the figures above include none.
How quotes work for Oldham homes
RoboMo™ sketches panels on your Oldham roof from aerial imagery. Then independent partner installers price that sketch. Kilowatts UK is the comparison site; your chosen installer does the survey and work under its own contract.
Oldham and Electricity North West
Oldham is Electricity North West territory (ENA). At 3 kWp an Oldham system usually stays within G98 (16 A per phase, 3.68 kW single-phase: Electricity North West’s G98 page); the installer sends Form B after commissioning (Form B guide). A bigger array means a G99 application before work (ENWL advice).
Oldham planning rules
Oldham Council has 36 conservation-area records on the Planning Data register, one of the highest counts in the county. Outside them, house roofs are usually permitted development under GPDO Part 14, Class A as amended by SI 2026/896 (0.2 m maximum projection, below the ridge); inside them, or on a listed building, ask the council. Rules: Part 14 of the GPDO.
Oldham home batteries
Partner installers in Oldham
Partner installers cover Oldham. To see firms by name, open the installer directory.
Other services in Oldham
Kilowatts also compares quotes for these other home jobs; each link is a UK-wide page:
Oldham terrace? Get installer quotes.
Sources
- ONS Census 2021, TS044 Accommodation type (Nomis): Census day 21 March 2021; percentages are ours; checked 4 November 2026.
- ONS Census 2021, TS054 Tenure (Nomis): Census day 21 March 2021; percentages are ours; checked 4 November 2026.
- PVGIS 5.3 PVcalc (European Commission JRC), SARAH3 data: model run 4 November 2026.
- DESNZ, Solar PV cost data 2025/26, Regional costs (TIC): published 28 May 2026; North West region, April 2025 to March 2026 installs; checked 4 November 2026.
- Energy Saving Trust, Battery storage: checked 4 November 2026.
- Energy Saving Trust, Solar panels: checked 4 November 2026 (EST figures use fuel prices as of July 2026).
- Ofgem, Changes to energy price cap between 1 October and 31 December 2026: applies 1 October to 31 December 2026.
- HMRC, VAT on energy-saving materials and heating equipment (Notice 708/6): zero rate 1 May 2023 to 31 March 2027; checked 4 November 2026.
- Energy Networks Association, Find my network operator: checked 4 November 2026.
- Electricity North West, G98: small scale connection, generation and storage: G98 up to 16 A per phase (3.68 kW single-phase, 11.04 kW three-phase), Form B to ENWL; larger systems fall under G99; checked 4 November 2026.
- Electricity North West, Guide to G98 Form B completion (PDF): Form B submitted within 28 days of commissioning, completed by the installer; checked 4 November 2026.
- Electricity North West, Installation (renewable energy): notification after installation within 3.68 kW single-phase; talk to ENWL first for larger systems; checked 4 November 2026.
- Planning Data (MHCLG), Conservation area dataset: records counted by council on 4 November 2026; the register may be incomplete, so council lists take priority.
- GPDO 2015, Schedule 2, Part 14, Class A: checked 3 November 2026.
- The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2026 (SI 2026/896): amends Part 14 Class A; checked 3 November 2026.
Solar performance in Oldham depends heavily on roof orientation, pitch and shading. Properties with south-facing or east-west roofs typically achieve the strongest generation results, while shading from nearby buildings or trees can reduce performance.
Choose a town below or start a property assessment to explore suitable solar options.