Skip to content

Solar panels in Bury: what a semi or terrace roof can produce

Last checked: 4 November 2026. All figures are sourced and dated below.

Bury is the smallest of the seven boroughs with a Kilowatts guide, at 80,695 households. 38.6% are semi-detached, 28.3% terraced, 18.8% detached and 12.7% flats (ONS TS044), and 34.4% are owned outright (ONS TS054). Owner-occupiers can usually decide for themselves, which makes the sums below the main question.

Other boroughs: solar panels across Greater Manchester.

How much electricity a Bury roof makes

PVGIS 5.3 figures for a Bury roof (35° tilt)
FacingkWh/kWp a year (PVGIS estimate)3 kWp, kWh a year (estimate)
South8612,583
South-east8152,445
South-west8132,439
East6972,091
West6952,085
North4901,470

For a Bury semi, the gap between south (861 kWh per kWp) and an east/west pair is about 495 kWh a year at 3 kWp: 2,583 kWh against 2,088. West (695) and east (697) model almost the same. December output is about 26 kWh per south kWp, June about 108.

Settings used for Bury (53.593, -2.298): PVGIS 5.3 with SARAH3, 35° panel angle, 14% system losses and terrain shading, run 4 November 2026. The model does not see dormers, trees or next door’s extension.

Ballpark costs in Bury

System sizeRough cost (estimate)Derived from
3 kWp, solar only≈ £5,400North West £1,799.83/kW (under 4 kW)
3 kWp + 5 kWh battery≈ £10,000plus about £4,600 for 5 kWh
5 kWp, solar only≈ £8,100North West £1,626.86/kW (4–10 kW)

Bury sits in the DESNZ Solar PV cost data 2025/26 North West region (published 28 May 2026). Its averages cover installs from April 2025 to March 2026. Rows are an example (estimate); battery cost from the Energy Saving Trust.

Under HMRC Notice 708/6, home solar and storage installs are zero-rated for VAT up to 31 March 2027.

Quotes for Bury roofs. Save the RoboMo™ plan, then compare.

Start comparing Draw my panels in RoboMo™

Call 0800 009 6058 (free).

Using Kilowatts for a Bury roof

Kilowatts UK compares prices rather than fitting panels. Your RoboMo™ layout is quoted by independent partner installers, and the installer you go with handles survey, fitting and paperwork directly with you.

Bury grid connection

Bury is served by Electricity North West (ENA lookup). G98 covers up to 3.68 kW on single phase (Electricity North West’s G98 page), with Form B sent by the installer within 28 days (Form B guide). A 5 kWp Bury roof would normally go through G99 or an export limit (ENWL).

Bury: planning and conservation areas

Bury Council shows 12 conservation-area records on the Planning Data register, the fewest among our Greater Manchester town pages. Roof panels on a house are generally permitted development under GPDO Part 14, Class A as amended by SI 2026/896. Rules: Part 14 of the GPDO.

Bury: should you add a battery?

Partner installers in Bury

Partner installers cover Bury. For named companies, see the installer directory.

Other services in Bury

Kilowatts also compares quotes for electrical and heating jobs too. National pages:

Bury house? Get installer quotes.

Sources

A clearer starting point

Assess solar options in Bury

Enter the property's postcode. RoboMo™ uses the building and its surroundings to compare suitable panel layouts.

STEP 1

Choose Home, Business or Industrial

Enter your postcode to start your assessment.

It's fast, free and effortless.

STEP 2

Choose the building on the map

STEP 3

See your comparison

STEP 4

Sit back and watch RoboMo™ work

RoboMo™ analyses your roof and builds your personalised solar comparison.

Local context

What matters in Bury

Compare solar panels for your property

Use the property's postcode and building details for a more useful starting point than a generic local average.

Start your solar assessment

Related solar topics

Explore useful topics connected with solar in Bury.

Get solar quotes in Bury

Compare installers and prices for solar in Bury.

Get solar quotes

FAQ

Need Help? RoboMo's Got Answers

How productive is solar in Bury?
PVGIS: about 861 kWh per south-facing kWp a year, or 2,583 kWh for 3 kWp; due north gets 490 per kWp.
Will my Bury installer tell the network?
Yes. Up to 3.68 kW single-phase they file G98 Form B with ENWL within 28 days; above it they apply under G99 before fitting.
Do I need planning permission for solar panels in Bury?
Usually not on a house roof, under permitted development. Planning Data lists 12 conservation-area records for Bury Council; check with the council if yours is in one.
Do Bury quotes cover batteries only?
Yes, via the separate battery-only quote form.
Is Kilowatts the company that installs in Bury?
No. We compare quotes. The independent partner installer you pick does the survey and fitting under its own contract with you.

Live help

Need help right now?

Talk to RoboMo™ and get instant answers.