East and west roof slopes peak at different times. Here's why they need separate MPPT inputs, and why two DC sockets on an inverter isn't the same thing.
Wiring an east roof and a west roof into one solar string forces both to share one operating point. Here is why that costs output, and how two MPPTs fix it.