Skip to content

Everything Tagged with Hybrid System Questions

Description: An informative clean diagram showing the Boiler Upgrade Scheme heat pump process in England and Wales, with simple labelled stages: property check, heat loss survey...

BUS Grant for Heat Pumps 2026: Eligibility and £7,500 Subsidy

By: David Coleman  ·  Published: 2026-07-18 15:22:04  ·  Updated: 2026-07-26 18:16:48

The grant is not based on heat pump size, so an eligible 4 kW air source heat pump and an eligible 6 kW air source heat pump receive the same subsidy.

Need help right now?

Talk to RoboMo™ and get instant answers.