Preferred on Google
Hero

Business battery storage in the UK — costs, savings, sizing and installation

Business battery storage can cut electricity bills if your site regularly has surplus solar to store, can buy electricity at cheaper times or pays demand charges it can reduce by cutting peaks. A battery can also keep selected equipment running in a power cut if the system is designed for backup. Whether it pays for itself depends on when you use electricity, your import and export tariffs, charging losses and the full installation cost. Start with a year of half-hourly electricity data to see which benefits your site can use.

How a commercial battery works

A battery energy storage system (BESS) combines battery modules, an inverter, electrical protection and controls. A behind-the-meter system sits on the business’s side of the meter. Its controls use site measurements and operating schedules to decide when to charge and when to supply equipment in the building.

If you already have solar panels, ask the installer to assess an AC-coupled battery with its own inverter alongside the existing solar inverter and metering. For a new solar installation, compare that setup with a compatible hybrid inverter that manages both solar and storage. The choice affects switchboard work, equipment compatibility and how the controls limit combined solar and battery export.

When battery storage makes sense for a business

Look for a pattern that repeats often enough to justify the investment. A warehouse that exports rooftop solar at midday and charges fleet vehicles after shifts may be able to use that surplus in the evening. A factory with short, repeatable production peaks may benefit from peak shaving if those peaks affect the charges on its bill.

Overview

The scope for savings is smaller if the business already uses most of its solar as it is generated, pays similar import rates throughout the day and has few charges it can reduce by cutting peaks. Model practical changes to electricity use before settling on a battery size. Charging fleet vehicles during solar hours or staggering equipment starts may reduce the amount of storage you need.

How to size a battery for your site

Size power and energy separately. Continuous AC output in kilowatts (kW) determines how much load the battery can supply at once. Usable energy in kilowatt-hours (kWh) determines how long it can sustain that output. A battery with 200 kWh available to discharge on the AC side could supply a constant 100 kW for two hours. Ask where the supplier measures usable energy and how much will be available once you set aside a backup reserve.

Use a full year of half-hourly import data where available. Add generation and export data if you already have solar. For a proposed array, ask for a generation profile that reflects the roof’s orientation and shading. Flag shift changes, seasonal loads and planned equipment such as fleet chargers or heat pumps. The model should show when the battery can charge and whether there is enough demand later to use that energy.

Half-hourly readings help you model bills, but equipment selection may require shorter measurements. This matters if refrigeration compressors, pumps or other motors will run on backup power. Their starting currents can be much higher than the half-hourly average. Ask how much power the inverter can supply briefly, how long it can sustain that output and what its continuous rating is.

What business battery storage costs and how to estimate savings

The installed cost depends on usable capacity, inverter power and the work needed to house and connect the equipment. Ask installers to itemise the battery, controls, switchgear, cabling, civil works and commissioning. Check the VAT treatment, the cost of monitoring and maintenance, and who pays for any enabling works the survey identifies.

Compare projected bills with and without the battery using the same half-hourly data and tariff assumptions. For a solar project, model solar alone and then solar with storage to see what the battery contributes. Include the cost of grid charging, the solar export income you give up and any demand charges the controls can realistically avoid. Ask for AC-to-AC round-trip efficiency under stated test conditions. Check whether the model includes electricity used on standby and by auxiliary equipment.

If the site receives Smart Export Guarantee payments, confirm how your export supplier will treat electricity exported from the battery, particularly if it can charge from the grid. Check the metering arrangement and payment terms before including that income in the model.

Worked example of commercial battery payback

Suppose a business charges its battery at 12p per kWh and uses the stored electricity to avoid imports at 25p per kWh. At 80% AC-to-AC round-trip efficiency, the battery takes 1.25 kWh to deliver 1 kWh to the site. That costs 15p in charging electricity and saves 10p per kWh delivered. If the battery replaces 100,000 kWh of higher-priced imports a year, the business saves £10,000 after charging costs. At an assumed installed cost of £80,000, the simple payback is eight years. These figures are illustrative.

If the higher import rate falls to 21p per kWh, the saving drops to 6p per kWh delivered. At the same annual discharge, the business saves £6,000 a year and simple payback rises to about 13.3 years. If the original rates hold but fewer profitable cycles reduce annual discharge to 70,000 kWh, the business saves £7,000 a year and simple payback rises to about 11.4 years.

The example covers grid tariff shifting and excludes maintenance, finance, changes in battery capacity over time and any savings from solar or peak shaving. Ask installers for a base case and a downside case using your site data. Check the model’s annual throughput and projected capacity against the warranty terms for years, throughput and retained capacity.

What to check before a UK battery installation

Have your installer confirm the connection route with the local distribution network operator before you commit to equipment. In Great Britain, G98 and G99 cover relevant generation connection routes, including storage. Ask whether G100 applies if the design limits imports or exports. Have the installer assess the combined solar and battery proposal at the connection point, taking account of existing permissions and proposed limits. In Northern Ireland, confirm the process with the local network operator.

Give the installer the site’s single-line electrical diagram if you have one, and arrange a survey of the main switchboard, metering and cable routes. The survey should establish whether the board can accommodate the connection and how the battery controls will work with existing solar, chargers or standby generation. Budget for any switchgear replacement and schedule any shutdowns needed to connect the system.

Check planning requirements with your local planning authority and consult the insurer and landlord, where relevant, before choosing a location. The Department for Energy Security and Net Zero’s guidance on grid-scale storage can inform a commercial site assessment. It covers considerations such as fire spread to nearby buildings, emergency access and flood exposure. Assess these risks for your equipment and premises, along with ventilation, vehicle impact, lifting access, floor loading and maintenance clearance.

Can a business battery keep the site running in a power cut?

Yes, if the system can isolate the circuits it backs up from the public network and supply them independently in island mode. Ask the electrical designer how changeover, earthing and electrical protection will work when the site is connected to the grid and when it operates independently. The Institution of Engineering and Technology’s code of practice covers fixed commercial and industrial battery installations, including island-mode isolation.

Agree which circuits need to stay live, how much power they draw together, their starting currents and how long they need to run. Specify how much interruption each critical load can tolerate during changeover. If you expect rooftop solar to power those circuits or recharge the battery during an outage, confirm that the inverters and controls support it.

Holding charge in reserve gives you energy for outages and leaves less available for daily bill savings. Set the reserve according to the cost and consequences of downtime. Arrange a witnessed commissioning test under representative load to check the switch to backup power, the operation of priority equipment and the return to grid supply.

What to send installers for a useful quote

Send each installer the same half-hourly usage data, recent bills, import and export tariff terms, and any existing solar generation data. Explain what the battery needs to do and which objective takes priority if bill savings and backup compete for capacity. Ask each installer to specify usable capacity in kWh, continuous AC output in kW, how the battery will operate, the full installed cost and the assumptions behind the annual savings. When you compare installer proposals, check who handles the network application and what each installer will verify at commissioning.

If you are also considering rooftop solar, the Kilowatts UK solar comparison tool can help you find installers who can assess the roof and model both options. Ask for solar-only and solar-plus-storage proposals based on the same site data and tariff assumptions so you can see what the battery adds to the project.

Preferred on Google

Solar comparison

Compare solar for your property

Enter your postcode to assess your roof, compare solar options and get quotes from UK installers.

  • Free postcode start
  • Home, business and industrial
  • RoboMo™ maps your roof

See which panels fit your roof

Choose home, business or industrial, then enter your postcode. RoboMo maps the roof and ranks panel brands by fit.

Fast, free and no obligation to proceed.

1. Postcode Start the assessment for your property.

2. Pin the roof Mark the array on the map.

3. Compare RoboMo™ builds your options.

Battery storage ROI calculator

Battery ROI tool

See what a battery saves on your bill

Enter the day rate, off-peak rate and export rate. The calculator ranks batteries in the Kilowatts shop over 10 years. Home batteries also suit offices and small commercial sites.

Shop batteries

Write for Kilowatts.uk

Got a trade and something worth saying?

Write it here under your own name. Sign in, put a profile up, and start a guide. Pay only if you want more links from your articles out to your own site.

Register

Create a Kilowatts.uk account, or sign in if you already have one.

Author profile

Put your name, photo and experience on a public author page.

Start creating

Write a guide or a blog. Free authors can put one followed link to their own site in articles each month.

Write for us Register or sign in

FAQ

Need Help? RoboMo's Got Answers

Is battery storage worth it for a business?
A battery can make financial sense if you regularly export surplus solar, can charge at cheaper times or pay demand charges you could reduce by cutting peaks. The payback depends on how often those opportunities arise, your tariffs, battery losses and the full installed cost. Ask for a base case and a downside case using a year of half-hourly electricity data.
Can I add a battery to existing solar panels or install one without solar?
Yes, a business battery can work with or without solar panels. If you already have solar, ask whether a battery with its own inverter can work with your existing switchboard, metering and export controls. If you plan to charge from the grid, check whether the gap between cheaper and more expensive rates still gives you a saving after charging losses.
What size battery does my business need?
Size the power and energy separately. Continuous output in kilowatts (kW) tells you how much equipment the battery can supply at once, while usable capacity in kilowatt-hours (kWh) tells you how long it can sustain that load. Use half-hourly site data to estimate capacity, and check equipment starting currents separately if you need backup. Ask how much usable capacity remains for daily savings once you set aside a backup reserve.
How much does commercial battery storage cost in the UK?
The installed cost depends on usable capacity, inverter power and the work needed to house and connect the system. Ask for itemised quotes covering the battery, controls, switchgear, cabling, any civil works and commissioning. Check how VAT is shown and what you will pay for ongoing monitoring and maintenance.
How do I check an installer's savings and payback estimate?
Ask the installer to compare bills with and without the battery using the same site data and tariffs. If you are also buying solar panels, compare solar alone with solar plus storage to see what the battery adds. Check that the estimate accounts for charging losses, any solar export income you give up, ongoing costs and declining battery capacity. Compare the expected usage with the warranty's limits on years, energy throughput and retained capacity.
Will a commercial battery keep my business running during a power cut?
It can if the system is designed to isolate the circuits it backs up and supply them independently. Agree which equipment must stay on, how much power it needs and how long it must run. If you want solar panels to recharge the battery during an outage, ask the installer to confirm that the system supports this and test backup operation during commissioning.
What should I check before ordering a commercial battery?
Ask your installer to confirm the connection process with your local electricity network operator, taking account of any existing solar and proposed import or export limits. Have the installer survey the switchboard, cable routes and proposed battery location so the quote reflects the work needed. Check planning requirements with your local planning authority and discuss the location with your insurer and landlord where relevant.