How much do wind turbines cost uk
Published: 2026-11-24 14:18:23
Updated: 2026-11-24 06:19:22
A 6 kW pole-mounted home wind turbine costs about £28,000 installed in the UK. Check what rooftop, farm and factory quotes include before budgeting.
How much do wind turbines cost in the UK?
A 6 kW pole-mounted domestic wind turbine costs around £28,000 for equipment and installation, according to Energy Saving Trust guidance updated in November 2026. Rooftop turbines and larger farm or factory installations need site-specific quotes. The total depends on the turbine and mounting, foundation or structural work, lifting access, cable route and grid connection. Check what the price covers, including whether it includes VAT, before using it as a project budget.
Overview
The domestic benchmark and farm example differ in capacity, date and scope. Using either figure to calculate a price per rated kilowatt can give a misleading budget, especially if your site needs a longer cable route, a larger crane or work on the electricity supply.
What should an installed wind turbine quote include?
For a freestanding turbine, ask for separate prices for the turbine and mast, ground investigation, foundation design and construction, delivery, crane access and lifting. For a roof-mounted system, check who pays for the structural assessment and whether the quote covers reinforcement and measures to limit vibration in the building. For a domestic quote, use the home turbine installation guide to check the scope of work.
Ask the installer to mark the cable route and connection point on a site plan. Running a cable through a surfaced yard can add excavation and reinstatement costs. The connection may also require changes to existing electrical equipment. Check who handles planning documents, network paperwork, testing and commissioning. Ask for the total including VAT, where applicable, and check which sums are provisional and what could change them.
How do rooftop, pole-mounted and vertical-axis turbines compare?
A freestanding mast can lift the rotor into more exposed airflow if the site has room for the foundation, access and maintenance. A roof mount may cost less to install, but nearby roofs and trees can disrupt airflow. The supporting structure must also carry the loads and cope with vibration. Regional wind data can help you screen a site. A generation forecast should account for wind speed and turbulence where the rotor would sit.
A vertical-axis turbine rotates around an upright shaft. A flower-shaped rotor or a model marketed for urban use still depends on the wind at its mounting position. Ask for independently tested performance data for the exact model, including a power curve showing its electrical output at different wind speeds. Ask how the installer used that curve and the site’s wind conditions to estimate annual generation.
What makes a farm or factory wind turbine viable?
The financial case depends on how much electricity the business can use as the turbine generates it. A farm with seasonal loads or a factory that shuts at weekends may export more electricity than its annual consumption suggests. Where half-hourly demand data is available, ask the designer to compare it with expected generation and show how much electricity the site would use and how much it would export. Ask how much generation would be curtailed when the site cannot use or export the available power. Use the same demand data if you compare wind with solar for the site.
Check that long components can reach the site and that the ground can support the crane where it needs to stand. Find out whether construction would interrupt operations or take productive land out of use. For a refurbished turbine, ask for its service history, an assessment of its remaining life, written warranty terms and confirmation that critical parts are available. Include crane hire for major repairs in the lifetime cost estimate where relevant.
How much electricity could a wind turbine generate?
Rated power in kilowatts (kW) describes output under specified conditions. Annual generation in kilowatt-hours (kWh) is the energy produced over a year. A 6 kW turbine at an assumed annual capacity factor of 20% would generate about 10,500 kWh in a year. Capacity factor compares actual generation with what the turbine would produce at rated power throughout the year. The 20% figure is illustrative. Use a site-specific forecast for your budget.
Check whether the forecast accounts for electrical losses and downtime. Ask how any export cap would affect the amount of electricity you could use or sell. Value electricity used on site at the import unit rate you would otherwise pay, and value exports at the rate your supplier would pay. Allow for servicing, insurance and major repairs. Recalculate payback with lower generation and a smaller share of electricity used on site.
Which planning and grid checks should come first?
Ask your local planning authority about the proposal before ordering equipment. For domestic projects, consult Planning Portal’s wind turbine guidance in England, GOV.WALES’s *Planning permission: wind turbines* guidance in Wales, the Scottish Government’s householder permitted development circular on microgeneration in Scotland, or nidirect’s *Wind* guidance in Northern Ireland. Give the authority a site plan showing the turbine position, mounting and maximum blade-tip height. Ask what approvals or assessments apply to your location and the scale of the project, including whether permitted development rights apply.
Ask the installer to confirm the connection route with the distribution network operator and flag costs, export limits or approvals that could affect the design. In Great Britain, the Energy Networks Association’s *Distributed Generation Connection Guide* explains the G98 and G99 routes. In Northern Ireland, consult NIE Networks’ generation connection guidance. Tell the installer about any existing solar panels, batteries or other generation so the assessment covers the whole site.
Eligible wind installations in Great Britain can apply for a Smart Export Guarantee tariff. In Northern Ireland, check the export terms suppliers offer. Before budgeting for export income, ask your intended supplier what installation evidence and export metering it requires.
How to choose a wind turbine installer
Give shortlisted installers the same information about site access, electricity use and possible turbine positions. Ask for examples of comparable installations and a written generation forecast for the exact turbine model and hub height. Check what work each quote covers, who provides aftercare, what the warranty covers and who pays for lifting equipment if a major component needs replacing.
If the quote specifies Microgeneration Certification Scheme (MCS) certification, check the installer’s current wind certification in the MCS installer directory and look up the exact turbine model in the MCS product directory. Ask what certificate you will receive at handover. If the installer proposes equivalent evidence, get written confirmation that your intended export supplier accepts it for your installation before paying a deposit.
An exposed site with room for a mast and a workable grid connection is worth assessing. A sheltered garden or a roof surrounded by taller buildings may generate too little electricity to justify even a low installation price. If the property has poor wind exposure and a roof suitable for solar PV, explore solar options for your home and compare both quotes on total installed cost, expected maintenance and how much electricity you can use as each system generates it.
Solar comparison
Compare solar for your property
Enter your postcode to assess your roof, compare solar options and get quotes from UK installers.
- Free postcode start
- Home, business and industrial
- RoboMo™ maps your roof
See which panels fit your roof
Choose home, business or industrial, then enter your postcode. RoboMo maps the roof and ranks panel brands by fit.
1. Postcode Start the assessment for your property.
2. Pin the roof Mark the array on the map.
3. Compare RoboMo™ builds your options.
Battery ROI tool
See what a battery saves on your bill
Enter the day rate, off-peak rate and export rate. The calculator ranks batteries in the Kilowatts shop over 10 years. Home batteries also suit offices and small commercial sites.
Reading
Sources and further reading
They need clean wind at the rotor, a safe mounting position, planning acceptability, suitable grid connection arrangements.
Read article
See if a domestic wind turbine and battery storage suit your UK home. Check your site’s wind yield, size a battery and weigh savings against export income.
Read article
The main issues are wind quality, planning rules, structural safety, noise, grid connection, cost, turbine type, turbine size, and maintenance.
Read article
Wind plus battery is credible for a UK commercial site only with usable rotor-height wind, planning and a connection. Storage cannot make wind firm power.
Read article
Mo's Solar Mission
Mo's Mission Nominations
Garlinge Primary School and Nursery is a foundation primary school on Westfield Road in Margate, Kent, for children aged 3 to 11. It is m...
St Luke's Church of England Primary SchoolSt Luke's Church of England Primary School is a voluntary controlled Church of England primary school on Jubilee Road in Formby, Merseysi...
Comberbach Nursery and Primary SchoolComberbach Nursery and Primary School is a primary academy on Mather Drive in the village of Comberbach, near Northwich in Cheshire, for...
Locations
Solar installation near you
Write for Kilowatts.uk
Got a trade and something worth saying?
Write it here under your own name. Sign in, put a profile up, and start a guide. Pay only if you want more links from your articles out to your own site.
Register
Create a Kilowatts.uk account, or sign in if you already have one.
Author profile
Put your name, photo and experience on a public author page.
Start creating
Write a guide or a blog. Free authors can put one followed link to their own site in articles each month.
FAQ
Need Help? RoboMo's Got Answers
How much does a home wind turbine cost in the UK?
Is a roof-mounted wind turbine cheaper to install?
How much does a wind turbine cost for a farm or factory?
What should a wind turbine installation quote include?
How much electricity could a 6 kW wind turbine generate?
How can I work out whether a wind turbine will pay for itself?
Do I need planning permission or grid approval for a wind turbine?
Can I get paid for electricity exported by my wind turbine?